Company

Connecting resources
with industrial value.

PT Basis Integrasi Global develops waste-to-value systems that connect waste management, processing technology, and material applications.

Illustration: Company
Illustration

WHY PT BIG

Seeing waste
as a resource.

The waste-management challenge extends beyond collection and treatment. Recovered materials also need a clear route to useful applications.

We bring feedstock characteristics, technology choices, and end-user requirements into one framework. Facility development begins with the connection between material sources and their intended applications.

Four principles.
One complete system.

01

Start with the material

Composition, volume, and supply consistency guide each process choice.

02

Connect the process

Intake, sorting, processing, and quality control are developed as one connected sequence.

03

Give products a purpose

End-user requirements guide specifications, testing, and product applications.

04

Define the partnership

Clearly defined roles, responsibilities, and requirements form the basis of collaboration.

Pangkal Pinang.
Integration at one site.

PT BIG’s facility development brings together sorting, processing, and material recovery. Each zone has a role in connecting resources with end-user requirements.

The Pangkal Pinang project is in development, with a design capacity of 55 tonnes per day and a planned area of approximately 2 hectares. Process integration, output quality, and partner requirements are central to its development.

55tonnes / day

Design capacity

±2hectares

Facility planning area

07facility zones

Process zoning

04product pathways

Product development focus

The right materials. Connected processes. Products with a clear purpose.

Explore the facility system

PARTNER WITH PT BIG

Build solutions.
Create value together.

Working on waste management, material supply, or processing technology? Explore a partnership that fits your organization.

Explore partnership opportunities